Sector

Infrastructure, Resources and Engineering

Return to sectors
Western Australia

Iron Ore Process Plant

The project consisted of an EPC major works package relating to an Iron Ore Processing Plant and components of the Marine Load Out Facilities. Our role was consulting analyst for the respondent in an international arbitration where he undertook the analysis of delays to 50 separate works packages.

View case study

Motorway-Construction-Infrastructure-Thumbnail
New Zealand

Motorway Construction

The project consisted of the construction of a 27-km dual carriageway by a leading contractor. Our role was acting claims consultant in the review of a delay, disruption and acceleration claim.

View case study

Motorway-Construction-2-Infrastructure-Thumbnail
New South Wales

Motorway Construction

The project consisted of the construction of temporary diversions and enabling works for a major roads and maritime service arterial highway upgrade. Our role was acting claims consultant preparing and providing advice on delay, disruption and acceleration claims.

View case study

New South Wales

Maritime Civil Project

The project consisted of a reclamation and construction of civil platforms for port activities. Our role was acting claims consultant to assist the main contractor with the preparation and presentation of variations and delay claims for adjudication and arbitration.

View case study

Maritime-Civil-Project-2-Infrastructure-Thumbnail
Queensland

Maritime Civil Project

The project consisted of a dredging and backfill operation for a pipe crossing at Gladstone. Our role was lead support analyst for a party appointed expert where claims for variation, delay and loss of profit were assessed against the contractual regime for arbitration proceedings.

View case study

Directional-Drilling-Infrastructure-Thumbnail
Western Australia

Directional Drilling

The project consisted of a horizontal directional drilling project for power and communications. Our role was lead support analyst for party appointed expert where claims for variation were assessed against the contractual regime for litigation proceedings.

View case study

Ship-Load-Out-Facility-Infrastructure-Thumbnail
Queensland

Ship Load Out Facility

The project consisted of the fabrication of a ship loader in Malaysia for port load out activities in Queensland. Our role was lead support analyst for party appointed expert where claims for delay, disruption, acceleration and variation were assessed for litigation proceedings.

View case study

Offshore-LNG-Infrastructure-Thumbnail
Western Australia

Offshore LNG

The project consisted of construction of subsea infrastructure for offshore LNG activities. Our role was claims consultant providing advice and analysis on daily records, offshore site conditions, latent conditions and time related claims.

View case study

Onshore-LNG-Infrastructure-Thumbnail
Northern Territory

Onshore LNG

The project consisted of the civil remediation and reclamation for a LNG project in the Northern Territory. Our role was claims consultant providing the project team with advice and the preparation of claims for delay and disruption.

View case study

Coal-Export-Facility-Infrastructure-Thumbnail
Queensland

Coal Export Facility

The project consisted of the onshore construction of port load out facilities in Queensland. Our role was lead support for party appointed expert where claims for delay, disruption, acceleration and variation were assessed for litigation proceedings.

View case study

Coal-Processing-Facility-Infrastructure-Thumbnail
Queensland

Coal Processing Facility

The project consisted of the brownfield upgrade of an existing coal processing facility. Our role was as party appointed expert for the assessment of claims for delay, disruption and acceleration in adjudication proceedings.

View case study

Bulk-Remediation-Engineering-Infrastructure-Thumbnail
New South Wales

Bulk Remediation & Engineering

The project consisted of the construction of in ground retaining structures in a contaminated site including processing and remediation. Our role was acting claims consultant preparing and providing advice in respect of delay, disruption and acceleration claims.

View case study

Metro-Rail-Project-Infrastructure-Thumbnail
Qatar

Metro Rail Project

The project consisted of the design and construction of a new Metro Line and 15 stations including stabling yards, switchboxes, tunnels and MEP. Our role was to support the nominated Expert through the compilation and processing of datasets to establish the chronology of matters and the provision of advice in respect of delay, as built critical path and causation.

View case study

Motorway construction durban
Durban

Motorway Construction

The project consisted of a new civil highway with elevated roadway corridors and bridges.  Our role was lead support for the party appointed expert in which we provided delay analysis to support arbitration proceedings.

View case study

Metro rail paramatta
New South Wales

Metro Rail Project

The project consisted of the enabling works for a new light rail transit system.  Our role was lead planner and delay analyst for the Contractor(s) in which we provided planning, delay and disruption analysis for commercial settlement.

View case study

marine civil port villa
Port Vila

Marine Civil

The project consisted of the construction of a new wharf and marine berthing structure.  Our role was appointed expert in which we provided delay and disruption analysis for dispute board proceedings.

View case study

Road infrastructure project port villa
Port Vila

Road and Infrastructure Project

The project consisted of the construction of a new drainage and road network within an urban environment.  Our role was appointed expert in which we provided delay and disruption analysis for dispute board proceedings.

View case study